Slurry Selection Guide Pavement Rehabilitation
| Surface Description | Severity | Pretreatment | Surfacing | Other | |||||
| Patch | Dig Out | Crack Fill | AR Chip/Slurry | AR two layer system | AR Three layer system | Recycle | Petromat/Overlay | ||
| Potholes | surface only, less than 6 inch diameter | ![]() |
![]() |
![]() |
![]() |
||||
| surface only, greater than 6 inch | ![]() |
![]() |
![]() |
||||||
| Surface collapsing with cracking | ![]() |
![]() |
![]() |
![]() |
|||||
| Cracking Longitudinal Lateral |
>5mm | ![]() |
![]() |
![]() |
![]() |
||||
| >10mm | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||
| Cracking Fatigue |
No Loose Sections | ![]() |
![]() |
![]() |
![]() |
![]() |
|||
| Uneven Surface | ![]() |
![]() |
![]() |
![]() |
![]() |
||||
Note if any or all are created due to water damage, drainage should be investigated first
Last Updated (Wednesday, 09 December 2009 15:21)
